Small connections are for residential, industrial, or commercial connection services between 70kVA – 3MVA.
-
Connection timeframes
The delivery of field works is dependent on your timelines and the complexity of the required services. We recommend you let us know about your project as early as possible to ensure we can work to deliver to your desired timeframes.
Please note the lead-time from our suppliers for items such as transformers has also increased to 10 months.
New connection, alteration to an existing connection, or disconnection
Process |
We recommend you get in touch with us to discuss your connection before starting an application: Network.ConnectionAdvice@evoenergy.com.au Receive connection advice Note: not all applications will require this step. Get in touch with us if you’re unsure if this is required.
Apply for connection services
|
Timeline |
|
Cost |
Our charging process for these connections is in our Connection Policy. The cost will vary depending on the type of connection. Upfront Design and PNA fees are documented in the ‘Fee-based ancillary service charges’ section of our Schedule of electricity network charges. Please note a PNA does not include a quote, only an application for connection includes this. |
Cancellation |
If you need to cancel prior to receiving an offer, please contact the Evoenergy Designer you have been liaising with for your connection. |