Natural gas connection and disconnection

ELECTRICITY EMERGENCY

13 10 93

GAS EMERGENCY

13 19 09

We own and operate two gas networks:

  1. The ACT Region network that services the ACT, Queanbeyan, Jerrabomberra, Googong and Bungendore
  2. The Nowra network that services Bomaderry and Nowra.

Jemena manages both gas networks for us, along with contractors, Zinfra, who maintain our infrastructure and provide field services.

Choose the right option for a gas connection, modification, or disconnection below.

Information about prices is available on our gas network prices page, along with information about the ACT Region and Nowra gas networks.

How gas is supplied

Gas supplied through Evoenergy’s gas networks comes from:

  • APA Group’s Moomba-Sydney Pipeline System (MSP): sourced from on-shore gas fields in Queensland and South Australia
  • Jemena’s Eastern gas Pipeline (EGP): primarily sourced from off-shore fields in Victoria/Bass Strait.

All gas in Evoenergy’s networks conforms to Australian Standard AS 4564:2020 which specifies the characteristics of natural gas for general-purpose use.

  • Evoenergy does not currently blend either biomethane or hydrogen into natural gas it distributes
  • Evoenergy does not supply propane or LPG, which is transported and supplied in gas cylinders.

Arranging a new natural gas connection

New natural gas network connections are no longer available in the ACT unless your premises is exempt under the Regulation to prevent new gas connections in the ACT. Since 8 December 2023, new gas connections have been prevented in some zones and buildings under ACT Government regulation. These changes do not apply in NSW. More information is available on the ACT Government website.

There are two ways you can arrange a new eligible natural gas connection. You can choose to:

  1. Contact your energy retailer to arrange a new natural gas connection. Once your retailer submits to us a new natural gas connection application on your behalf, we will assess the application. Within 10 business days after receiving a complete application and any additional information required to assess it, Evoenergy will advise your retailer of the applicable connection process.
  2. Use the Jemena connections portal to apply for a gas connection or modify or remove an existing one. You will still need to contact your energy retailer to sign up to or change your gas plan.

From 1 October 2026, an up-front connection charge will apply for all new connections under the National Gas Rules. The charge will reflect the necessary costs directly attributable to providing the connection such as applicable service pipe, meter, materials, labour and administration. Each application will be assessed individually, and the connection offer will outline the work included and the applicable charge.

Types of connections

Routine Connection: a connection for a standalone building with ≤ 320MJ/hr demand that does not require an extension or augmentation of the gas distribution pipeline or involve complex site requirements.

Routine residential and small commercial connections may require different service line lengths and configurations. Evoenergy will assess the work required for each site and provide an individual connection offer outlining:

  • the work Evoenergy will undertake,
  • the upfront connection charge,
  • payment arrangements,
  • customer responsibilities and;
  • the proposed delivery timeframe.

For more information about connection charges, meter locations, customer-side work, construction timing and complaints, see our New gas connection frequently asked questions.

Any additional site-specific or non-standard work may increase the directly attributable connection costs or affect the delivery timeframe. This may include:

  • a knock-down rebuild
  • difficult site conditions
  • restricted access
  • non-standard metering or;
  • other non-standard connection work.

Negotiated connection: all new connections over 320 MJ per hour or which require mains extension are classified as negotiated. Read our Negotiation framework for more information.

Disconnections

  • Permanent disconnection (abolishment)

    If you want to switch your home from gas to electricity and no longer require natural gas at your premises – you should arrange a permanent disconnection, also known as an abolishment in the National Rules.

    "Permanent disconnection” and “abolishment” describe the same network service and are interchangeable. Evoenergy uses the term “Permanent Disconnection” as it is definitive and aligns with the ACT Policy to prevent future gas connections.

    A permanent disconnection must be arranged where building demolition works would be an unacceptable safety risk with gas present on the site.

    Contact your gas retailer in the first instance to arrange a permanent disconnection. Alternatively, you can submit an application through the Jemena connections portal.

    If you no longer want to use natural gas (all appliances are removed), permanent disconnection is the safest option as it:

    • Removes unused gas equipment from your property
    • Means your premises will no longer require maintenance, meter reading and routine checking of gas.

    Following a permanent disconnection:

    • The redundant service pipe will remain in the ground
    • The pipe will be purged of gas and physically disconnected from the distribution pipeline in the street at the front of your property.
    • The gas meter assembly will be removed.

    Basic permanent disconnection

    A basic permanent disconnection service applies to a single detached residential house where:

    • No cutting or restorations is required for concrete, bitumen and other hard surfaces
    • Active traffic management is not required.

    For properties with these restrictions or for more complex permanent disconnections, a negotiated complex permanent disconnection service is available. This may include:

    • High pressure connections
    • Large commercial or industrial sites and
    • multi-unit installations

    A basic permanent disconnection will be carried out in accordance with works planning and resourcing determined by our field sub-contractor, Zinfra.

    If you require the permanent disconnection completed by a particular date, such as before demolition works start, an urgent basic permanent disconnection service is available where the permanent disconnection will be carried out within 20 business days of the application.

    Pricing

    • Basic permanent disconnection: $747 (excl. GST) for a residential gas meter up to and including 25 cubic metres per hour capacity. (A standard residential gas meter has a capacity of 8 cubic metres per hour)
    • Set charges for larger gas meters. See the gas network prices on our website.
    • Your gas retailer may charge a higher amount when passing on Evoenergy’s charge.
    • Urgent basic permanent disconnection: $981 (excl. GST) charged by Evoenergy.

    Indicative timeframe

    Urgent basic permanent disconnection

    Completed within 20 business days of the application.

    Basic permanent disconnection (non-urgent)

    Completed in accordance with Zinfra’s works planning and resourcing, typically within 6 months of application.

    A Basic permanent disconnection includes:

    • Tracing of the service pipe from meter to the gas main.
    • Excavation to expose the service pipe near the gas main.
    • Cut and cap the service pipe in the public verge, near the gas main.
    • Reinstate soil and compact. Replace any grass sods previously removed.
    • Cut gas riser at ground level near the meter.
    • Remove the metering equipment.
  • Complex permanent disconnection

    Complex permanent disconnections covers all permanent disconnections that are not Basic (whether urgent or non-urgent) and are individually priced depending on the scope of work.

    Typical work scopes include:

    • Concrete cutting and restoration;
    • Active traffic management;
    • High pressure connections,
    • Large commercial or industrial sites; and
    • Multi-unit sites where coordination between multiple unit-holders and the ownership committee, strata title manager etc. is required.
  • Temporary disconnection

    A temporary disconnection is appropriate if you intend to reconnect your gas supply in the future.

    Following a temporary disconnection:

    • Gas remains within the distribution pipeline at your property
    • Your gas supply can be restored through a reconnection request

    Price: $100 (ex GST) for a temporary disconnection and $128 (ex GST) for a reconnection of a standard residential gas meter.

    Indicative timeframe

    • Evoenergy aims to complete 95% of temporary disconnections within 5 business days from receiving the retailer’s work order.
    • National Rules regarding how work is to be carried out for Fridays and days before public holidays apply.

    Arranging a temporary disconnection

    A temporary disconnection can be arranged through your energy retailer if you need to disconnect from gas for a short period. This method should only be used if:

    • you plan to reconnect gas in the future; or
    • you continue to protect the pressurised service pipe and metering equipment on your premises.

    A temporary disconnection includes

    To complete a temporary disconnection, a technician will modify the internals of a gas meter, preventing gas from flowing through the meter. Once completed, this cannot be seen from the outside of the meter and needs special skills to reverse.

    A temporary disconnection also prevents gas from entering a building. However, there is still pressurised gas in the service pipe connecting the network to the gas meter assembly. This means there remains a risk of damage to the service pipe if excavation activity comes in contact with it.

    To reestablish the flow of gas to the premises, you must contact your energy retailer.

Which service do I need?

Choose a temporary disconnection if you:

  • Only need your gas supply disconnected for a short period
  • Intend to reconnect your gas supply in the future

You can also choose a temporary disconnection where you do not intend to use gas again if you continue to protect the service pipe and meter installation from damage. This may be required for many years until the network itself is decommissioned (and depressurised) in your neighbourhood.

Choose a permanent disconnection (abolishment) if you:

  • Are demolishing your property
  • No longer require a gas connection
  • Want to remove the requirement to protect the service pipe and meter installation from future damage

Your rights and obligations

When requesting a temporary or permanent gas disconnection:

  • Provide complete and accurate information with your application
  • Ensure the service requested is appropriate for your circumstances
  • Evoenergy will complete the requested service in accordance with applicable energy laws and technical requirements.

If you have a complaint about our services, please see our Complaints and feedback page for information on how to lodge a complaint and the options available if you’re not satisfied with the outcome. You may also contact the ACT Civil and Administrative Tribunal (ACAT) by phone on 1300 362 072 or through their online portal www.ombudsman.gov.au/contact-us.

Other applications and requirements

Application for connection of detached residential premises
Connection of residential premises terms and conditions
Application for natural gas meter relocation
Natural gas meter relocation terms and conditions
Natural gas meter location guide
Application for meter/service upgrade or downgrade
Connection alteration (meter upgrade or downgrade) terms and conditions
Application for decommissioning and meter removal
Decommissioning and meter removal terms and conditions
Application for pulse output connection
Pulse output connection terms and conditions
Medium density/high rise terms and conditions
Application for connection to new industrial or commercial development
Connection to new industrial or commercial development terms and conditions
Requirements for gas centralised hot water system

Frequently asked questions:

  • Why are upfront gas connection charges being introduced?

    The Australian Energy Market Commission (AEMC) has changed the National Gas Rules governing new gas connections. From 1 October 2026, customers applying for a new connection will be required to pay a cost-reflective upfront connection charge.

    You can view the AEMC’s decision and find more information here.

  • What activities are included in a Routine Connection, and what does the connection charge cover?
    A Routine Connection is a connection for a standalone building where the demand is ≤ 320 MJ/hr. Evoenergy will assess the work required for the site and provide an individual connection offer. The charge will cover the necessary costs directly attributable to providing the connection, including applicable service pipe, meter, materials, labour and administration.
  • How do I tell where the front boundary of my property is?
    The front boundary is the legal property boundary adjoining the road reserve or street. It is typically not the kerb, footpath or front wall of the dwelling. Check the deposited plan, subdivision plan or survey information. If it is unclear, ask the developer, builder or a registered surveyor.
  • Where can I find suitable meter locations?
    The proposed location must meet Evoenergy’s safety and technical requirements and allow safe, unobstructed access for installation, reading, maintenance and emergencies. The final location is subject to Evoenergy’s site assessment. A "Natural gas meter location guide" is available on our website.
  • Why is the connection length relevant?
    Service length affects the route, materials, trenching, safety requirements, cost and delivery time. Each connection will be assessed individually.
  • How is a longer connection dealt with?
    Evoenergy will assess the additional route, materials, trenching and labour required. The scope, charge and proposed delivery timeframe will be set out in the connection offer. Where the scope of work requires more time, the offer will state the applicable timeframe and the reasons for it.
  • What are the reasons that would cause the meter to be located at the front boundary?
    In NSW, the meter may be installed near the front property boundary or on the public side of the boundary to provide safe and practical access for installation, meter reading, maintenance and emergency work. Evoenergy's preferred meter location is to hang the meter from the side or front of a building. Locating the meter at the front boundary or fenceline is only done in cases where a suitable meter location on the building cannot be determined. Where the meter is installed at the boundary, Evoenergy will confirm the network boundary and the work to be undertaken by Evoenergy and the property owner’s licensed plumber or gasfitter.
  • What activities are not included in the New Routine Connection, and what costs are the customer’s responsibility?
    Customer side work is separate from Evoenergy’s connection charge. This may include a licensed plumber or gasfitter, internal gas installation and appliance work, customer allocated site preparation or trenching, and compliance certification. The offer will identify Evoenergy’s work and the applicant’s responsibilities.
  • When during construction of a new home is the connection and meter installed?

    Installation must be coordinated with Evoenergy, the builder, retailer and licensed plumber or gasfitter. The approved route and meter location must be accessible and the site must satisfy the prerequisites stated in the connection offer before work is scheduled. Typically, we install the service pipe and meter after the building is at lock-up stage and after the gas fitter has completed rough-in of internal pipework but before concreters build formwork for driveways and footpaths.

    Note that obstacles such as scaffolding, waste skips, pallets of building materials and similar will prevent or delay the connection and meter installation.

  • How long will it take to connect once my site is ready?
    Evoenergy will use its best endeavours to connect the site within 20 business days after the premises requirements have been met and connection charges paid. Subject to matters outside the control of Evoenergy. Where the scope of work required more time, the offer will state the applicable timeframe and the reasons for it. Evoenergy will coordinate with the applicant, builder, gasfitter and its contractor, as relevant, and use its best endeavours to align the connection work with the builder’s construction schedule.
  • What should I do if I have a complaint or dispute?

    Customers are encouraged to contact Evoenergy first and provide an opportunity for the complaint to be resolved through its internal complaints management process. Complaints can be lodged with Evoenergy’s Customer Resolutions Team by calling 13 23 86 or emailing customerresolutions@evoenergy.com.au. Evoenergy will acknowledge complaints within two business days and will endeavour to provide a meaningful response within 20 business days.

    If the customer is dissatisfied with the proposed resolution, the complaint will be escalated to the relevant senior manager for review. For further information on how we handle complaints refer here. Customers are encouraged to complete this internal process before escalating the matter externally.

    If the customer is not satisfied with the internal process, they may also contact the ACT Civil and Administrative Tribunal (ACAT) by phone on 1300 362 072 or through their online portal www.ombudsman.gov.au/contact-us.

    For the avoidance of doubt, the AER will not become involved in a dispute until Evoenergy’s internal dispute resolution process has been followed and reasonable attempts to resolve the matter have failed.